Part deduplication is almost always the right first move, and the dependency chain explains why.
Why part dedup comes first:
BOM accuracy and CAD extraction both depend on a clean part master. If you fix BOMs without deduplicating parts, you’re normalizing relationships against duplicated entities — you’ll need to redo the work. CAD extraction populates structured attributes, but those attributes need to land on canonical part records. Extracting metadata into a fragmented part master just propagates the fragmentation.
Part deduplication also has the clearest, most auditable ROI signal: duplicate part count reduction, purchase consolidation savings, and engineering re-use rate. These are numbers your CFO and procurement team can validate independently, which matters for credibility.
Technical sequencing reality:
The dedup effort forces you to define and enforce a classification taxonomy and naming convention standard — exactly the governance scaffolding that BOM rationalization and CAD extraction will require later. Doing it in reverse means building that scaffold twice.
For the dedup initiative specifically, expect to spend significant time on:
- Golden record definition rules (which part number wins across BUs)
- Merge/redirect logic in your PLM and each ERP instance
- Freeze policy to stop new-part proliferation (the change management piece most teams underestimate)
On CAD extraction: this is often pushed as AI-ready and fast to demo, but legacy drawing quality is typically inconsistent enough that extraction accuracy requires significant validation effort. Without a clean part master to receive the extracted attributes, you’re also solving a data-landing problem mid-project. Defer this to phase 2.
On BOM cleanup: highest operational urgency, but lowest standalone ROI — manufacturing and service pain is real, but BOM errors are often symptoms of part master chaos rather than independent problems.
Organizational note: the freeze policy on new-part creation is where most programs stall. Secure explicit engineering leadership commitment to a gated part creation workflow before you start dedup, not after. Without it, you’re draining a bathtub with the tap running.
Tooling costs for dedup (similarity matching engines, PLM-ERP sync connectors, classification tools) vary substantially by vendor and deployment model — verify with vendor for current pricing.
This draft is based on general PLM knowledge. It has not been verified against your specific version and environment. Practitioners: verify the steps and share your experience below.